Description / Abstract:
This guide, covering three-phase ac systems from 1 kV to 800 kV,
provides recommended electrical operating and safety clearances and
insulation levels in air-insulated electric supply substations;
addresses insulation coordination procedures; provides design
procedures for the selection and coordination of the insulation
levels within the station as they relate to substation clearances;
and addresses how reduced clearances in high-voltage ac substations
will allow for compact bus arrangements and substation voltage
uprating applications.
This guide addresses insulation coordination procedures,
including the choice of insulation levels and arrester
specification, in limited detail and only as relevant to clearance
requirements. Detailed and expanded coverage of insulation
coordination procedures is provided in other ANSI and IEEE guides
and standards (see Clause 2).
This guide focuses on open-air bus assemblies and configurations
and excludes apparatus clearances (i.e., bushing clearances for
transformers, and breakers). Detailed coverage of apparatus
clearances is provided in other applicable guides and
standards.
Purpose
Proper electrical clearances are necessary for the design,
construction, and operation of electric supply substations. This
document develops guidelines for the application of recommended
electrical clearances and insulation levels in air-insulated
substations. The recommended clearances incorporate both
design/operating clearances and safety clearances.